PAXARO Infra Design specializes in the design and engineering of various infrastructural objects, including bridges, tunnels, viaducts, quay walls, noise barriers, and more.

Project Oosterweel

For the contractor consortium TM ROCO. The Oosterweel project is the largest infrastructure project in the Benelux. It consists of several sub-projects. The biggest transformation will take place in the northern part of Antwerp. The current Antwerp Ring Road will disappear; the Merksem Viaduct will be demolished to make way for a lowered Ring Road that is partially covered. As a result, the Ring Road will disappear from view, and new parks will be created in the freed-up space to provide more greenery. PAXARO, commissioned by the contractor consortium TM ROCO, is responsible for designing the reinforcement of various concrete structures.

A15 Maasvlakte-Vaanplein

For the contractor consortium A-Lanes. This project involves upgrading a 37 km section of the A15 motorway between the Maasvlakte and the Vaanplein to motorway standards, the construction of a new Botlek Bridge for road traffic and the port railway line, the reconstruction of the Botlek and Thomassen Tunnels, the reconstruction of 36 viaducts, the construction of twelve new engineering structures, a dynamic traffic management system along the entire route, and the maintenance of existing and new roads and structures until 2035. PAXARO contributed to the engineering of viaducts and bridges, systems engineering, and document management.

De Nieuwe Afsluitdijk

For the contractor consortium Levvel. In cooperation with construction consortium Levvel, Rijkswaterstaat is reinforcing the Afsluitdijk. The construction consortium consists of BAM, Van Oord, Rebel, and Invesis. Levvel is responsible for designing, building, and financing the reinforcement of the Afsluitdijk, as well as maintaining it for 25 years. Part of this project includes the reconstruction of the Den Oever Floodgate. For the lock head, PAXARO carried out the 3D modelling of the reinforcement and produced the detailed reinforcement drawings.

A9 Badhoevedorp-Holendrecht

Near Amstelveen, a 1.6-kilometre section of the A9 motorway is being constructed in a lowered position, with three covered sections: one near the Oude Dorp, one near the Stadshart, and one near the Bovenlandpad.

Together with engineering firm Sweco, PAXARO is working for contractor Veenix on the final design (UO) of the lowered section. We are providing:

  • Lead engineer
  • Structural calculations
  • Formwork drawings
  • 3D reinforcement design

Zuid West 380 KV West

For contractor BAM. 3D modelling of reinforcement and preparation of reinforcement drawings for the foundations of Wintrack pylons.

A7 – Aanpak Ring Zuid Groningen

For the Herepoort consortium. The “Aanpak Ring Zuid” project is the large-scale reconstruction of the southern ring road of Groningen. Between Julianaplein and Europaweg, the southern ring road has been constructed in a lowered position, making it disappear from view. This lowered section opened to traffic in 2024. For contractor Herepoort, PAXARO carried out the final design (UO) of the concrete structure of the lowered section, including structural calculations, concrete and reinforcement design, and all related drawings.

Zuidas | Amsterdam

For the contractor consortium ZuidPlus. The A10 Zuid/Zuidasdok project improves accessibility to Amsterdam and the northern Randstad by widening the A10 Zuid motorway and partially tunnelling it near the Zuidas district. The project also includes the reconstruction of the De Nieuwe Meer and Amstel junctions, as well as the renovation and expansion of the NS and metro station. Since 2021, PAXARO has been involved in the engineering of the rail-bearing structures.

Zeesluis IJmuiden

For the contractor consortium OpenIJ. After 100 years, the Noordersluis in IJmuiden was due for replacement. A new, larger sea lock has been constructed to improve access to the Port of Amsterdam and stimulate the regional economy by providing tide-independent access for the ever-growing sea vessels. The new sea lock is 70 metres wide, 500 metres long, and 18 metres deep, and became operational in 2022. PAXARO contributed to this project by providing consultancy and engineering services for the sinking of the lock heads.

Theemswegtracé| Rotterdam

In the Europoort area, the Theemsweg route is being constructed on behalf of the Port of Rotterdam Authority. The Theemsweg route is approximately 4 kilometres long and provides a solution to the capacity bottleneck at the Caland Bridge near Rozenburg.

The new route runs over an elevated railway viaduct. The track includes two arch bridges and connects to the existing railway near the A15 motorway. By rerouting the railway line, the increasing rail traffic no longer interferes with shipping traffic, which will improve overall traffic flow.

PAXARO has made several contributions to this project, including the detailed engineering of the concrete works for a new wind barrier, as well as various contributions to the modelling of the railway viaduct and arch bridges.

Botlekburg| Rotterdam

In Rotterdam Europoort, the A15 motorway has been reconstructed in recent years. The final component of this project is the completion of the Botlek Bridge. On behalf of the construction consortium A-Lanes, PAXARO is contributing to the design of the railway connection over the bridge.

Noordelijke Randweg Voorhout

For the municipality of Teylingen. Preparing the final design for a road bridge and a bicycle underpass.

N213 Westland

For the contractor consortium VoGel (van Gelder/VOBI), PAXARO created the final design of the bicycle underpass beneath the roundabout on Provincial Road N213.

Wind barrier Het Theemswegtracé

For the construction of the Theemsweg route (the new freight railway line in the Europoort area), a large concrete wind barrier along the Neckarhaven was in the way.

This was demolished and replaced by a new wind barrier.

PAXARO carried out the engineering of the new wind barrier on behalf of the Port of Rotterdam Authority.

Fly-over voor Port of Amsterdam

For the Port of Amsterdam, PAXARO conducted a feasibility study for improving the flow of freight traffic from Ruijgoordweg in Amsterdam’s Western Port Area. One of the options is a flyover over the Westpoortweg. A visualization of the design has been created. 

View it here

 

Rijkswaterstaat Zee en Delta

Systems engineering and contract preparation for dredging contracts.

Havenbedrijf Rotterdam

For the Port of Rotterdam Authority, we created 3D objects of existing structures based on analog drawings and using the Port of Rotterdam’s object library, for use in the asset management system.

Projects

Project “The New Afsluitdijk”

Construction consortium LevveL is currently overseeing the "De Nieuwe Afsluitdijk" project on behalf of Rijkswaterstaat, which includes the Keersluis Den Over. As part of this project, PAXARO has been contracted to design the reinforcement for the floor and walls of the lock head, in support of LevveL.

Zuid West 380 KV West

TenneT has commissioned BAM to execute the Zuid West 380 KV West project, which involves the construction of foundations for high-voltage pylons. As part of this project, PAXARO is responsible for developing a 3D model of the reinforcement design and converting it into 2D reinforcement drawings using Allplan. The expected delivery date for this work is December 2020.

Ring South Groningen

The city of Groningen is planning to deepen the A7, thereby eliminating the only traffic light between Amsterdam and Hamburg.

PAXARO has been commissioned by the construction consortium Herepoort to participate in the design of structures and the sunken location.

To view progress on this project, please visit the live cam.

Zuidas

As part of efforts to remove the barrier of the A10 and create additional space for an expanded public transport hub, the A10 South in Amsterdam is being sunk.

PAXARO has been commissioned by the Zuidplus construction consortium to collaborate on the design of the rail-carrying structures.

You can view the timelapses here

Zeesluis IJmuiden

Construction of the world's largest sea lock is underway in IJmuiden.

PAXARO has been commissioned by the construction consortium OPEN IJ to participate in sinking the caissons for the lock gate greenhouses.

Botlekbrug

In recent years, the A15 in Rotterdam Europoort has undergone extensive reconstruction. The final phase of this project involves the completion of the Botlek bridge.

PAXARO has been commissioned by the construction consortium A-Lanes to participate in the design of the rail connection over the bridge.

Theemswegtracé

The Port of Rotterdam Authority is constructing a new freight railway line in the Europoort area, and PAXARO is working on the design for the SAVE construction consortium.

N213

PAXARO has completed the Definitive design for the bicycle underpass beneath the roundabout in the N213. This project was commissioned by the Vogel combination, which includes van Gelder and VOBI.

Be sure to watch the accompanying video as well.

Noordelijke Randweg Voorhout

The municipality of Teylingen is realizing a Northern Randweg in Voorhout, a core of the municipality.

PAXARO has designed the artworks for this project, including a bicycle tunnel, a road bridge, and a temporary access bridge.

Flyover for Port of Amsterdam

PAXARO conducted a variant study for the Port of Amsterdam aimed at improving the flow of freight traffic from the Ruijgoordweg in the Western Docklands of Amsterdam. One of the proposed solutions is a flyover over Westpoortweg, and a visualization of the design is available for viewing.

New windshield The Theemswegtracé

Before the construction of Het Theemswegtracé (the new freight railway line in the Europoort area), a large concrete windbreak along the Neckarhaven stood in the way. This has been demolished and a new windshield has been built in its place. PAXARO has carried out the engineering of the new windbreak on behalf of the Port of Rotterdam Authority.

Prior to the construction of the Het Theemswegtracé, a new freight railway line in the Europoort area, a large concrete windbreak along the Neckarhaven needed to be demolished and replaced.

PAXARO was responsible for the engineering of the new windbreak on behalf of the Port of Rotterdam Authority.